Saturday 6 September 2008

Tackling West End flooding concerns

Following the flooding concerns raised with me by residents arising out of the torrential downpour on 21st August, I have had feedback from the City Council about issues at a number of locations.

I am meeting with residents and a city council engineer shortly about the issues at two of the locations (Osborne Place and streets around West Park Road) and with regard to the lower end of Roseangle, I have been advised as follows:


"To address the specific complaints in your email the area inspector for Roseangle will check the road gullies at the locations reported and arrange for them to be cleared if required."


I have been further advised that the Roads Maintenance Section operates a maintenance programme which is both planned and reactive. Planned maintenance involves the gullies being serviced twice a year although in reality this is not always achievable because of obstruction from parked cars/skips/scaffolding. Reactive maintenance takes place on an ad hoc basis as required in emergency situations/following weather events.